| Sl.# |
Clients |
Scope of Works |
Year of Completion |
| 1 |
Bangladesh Inland Water Transport Authority |
Construction & Placement of 30 numbers 30.5m X 7.62m X 1.83m Terminal Pontoons |
Ongoing |
| 2 |
INDIAN OIL CORPORATION LIMITED |
Laying of 98 km long 8.625” ATF Pipeline from CPCL Manali Refinery to Chennai Airport Fuel Station at INDIA along with Combined Station Works.
|
Ongoing |
| 3 |
MARUBENI CORPORATION, Japan |
Erection Work of Exhaust Duct System for PDB Haripur Power Station. |
Ongoing |
| 4 |
CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. |
Erection of 9 numbers API welded Steel Storage Tanks for Condensate, Clean Produced Water, Dirty Produced Water and Fire Water. |
2007 |
| 5 |
Lafarge Surma Cement plant (Main contractor Larsen & Toubro (ECC Division of India) |
Construction of a 10 Km Cross- Country Long Belt Conveyor (which is a part of 17.5 km conveyor from Meghalaya in India up to Chhatak in Bangladesh) The work includes survey, piling work ( 1400 nos) construction of pile cap and R.C.C Trestles 10 to 12 m high – 400 nos along the entire route, fabrication and erection of conveyor gallery. Belt installation, electrical, Works, cladding as well as painting works. |
2006 |
| 6 |
CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. |
Construction of a 22 km 30” dia cross country gas pipeline and a 6” dia condensate line in the Bibiyana gas pipeline construction project.
This work include :
a) Construction of 2 nos valve station and
(b) Hill boring by HDD method.
|
2006 |
| 7 |
UNOCAL Bangladesh Block Thirteen & Fourteen Ltd. |
Construction of 14” gas pipe line 23 Km from Moulavibazar Gas Treatment Plant to Musai metering station including river crossing & construction of one valve station. |
2005 |
| 8 |
Mobil- Jamuna Lubricants Ltd. |
Construction of the Lubricant Blending Plant of Mobil Jamuna at Patenga, Chittagong. The plant included site development by earth filling development of foundation by sand piling, all civil works. fabrication and erection of the pant including fabrication of 48 nos steel vertical tanks, blending unit piping, structural, building electrical instrumentation and commissioning works. The work was done in association with Oilserv of Dubai, UAE. |
2004 |
| 9 |
Tullow Bangladesh Ltd. |
Construction of drill pad at Kashimpur Bangora and Lalmai Prospects including site preparation, filling of the area by carrying sand from Daudkandi Ghat, compaction bricksoling, cellar installation, installation of pit, Access Road Base camp etc. |
2003 |
| 10 |
Titas Gas Transmission & Distribution Co. Ltd of Petrobangla. |
Construction of 9 Km long 16” dia cross country pipe line, near Dhaka including Water crossing, Railway & Highway crossing & construction of valve station. |
2003 |
| 11 |
Holcim Cement Plant ( Holder bank group) |
Fabrication and erection of extension project of Holcim Cement plant at Meghnaghat. |
2002 |
| 12 |
Hydelberg Cement Co. Ltd (Main Contractor – Doosh on heavy Industries Ltd of Korea. |
Fabrication and erection of a cement grinding plant capacity 1600 ton/ day at Rupganj including erection of structures, Conveyors, Cement mills Hoppers Bins etc cladding & painting works. The work also included fabrication of about 300 MT of Hoppers Bins Cyclones O-Sepa , Bag Filter Air slide etc. |
2001 |
| 13 |
Cemex Cement (BD) Ltd. |
Construction work of the cement plant including structural steel warehouse, Fabrication of mechanical equipment, Bin, Hopper, bag fitter, Air slides, Steel structures, conveyor system, and erection of all mechanical & electrical items including instrumentation and commissioning. |
2001 |
| 14 |
Petrobangla – Bangladesh Gas Fields Co. Ltd (Main Contractor – Hyundai Engineering & Construction Co. Ltd. |
Construction of a 2 numbers LTS type Gas Treatment plant at Brahmanberia including Civil, Piling, Foundation, generator building, piping, mechanical erection, electrification, instrumentation and commissioning.
The work also included 5 km 4” cross country piping work for condensate.
|
2000 |
| 15 |
UNOCAL Bangladesh Ltd. |
Construction of drill pads at Jalalabad, Kapna and Ratna including earth work, approach road. Drill pad and cellar etc. |
2000 |
| 16 |
Kvaerner Process System Asia Pacific. |
Construction of a Gas Treatment Plant at Lakatura – Sylhet for Jalalabad Gas Treatment plant. The job included fabrication of pipe spools , erection of mechanical equipment, piping works, erection of pre-engineered building, mechanical erection work, construction of tank firm for 6 nos large dia tanks , electrical instrumentation and commissioning works. |
1999 |
| 17 |
Petrobangla – RPGCL ( Main Contractor – Hyundai Engineering Co. Ltd- Korea. |
Construction work including civil work sand piling, piping structural fabrication, erection electrification instrumentation and commissioning of all mechanical & electrical equipment for 5000 TPA LPG Plant at Kailashtilla – Sylhet District. |
1998 |
| 18 |
Occidental Oil Co. Ltd (a U.S Oil company Operating in Bangladesh) |
Construction of a 4.5 Km X 5.2 M heavy Duty all weather road through forest and hill at Sylhet including 17 R.C.C. Box culverts. |
1998 |
| 19 |
Occidental Oil Co. Ltd (a U.S Oil company Operating in Bangladesh) |
Land developent for jalalabad Gas Plant, Camp Site and Drill Site by cutting and grading of hills. |
1998 |
| 20 |
Jahangirnagar University, Savar, Dhaka. |
Construction of 2 nos Women students Hall, Capacity 500 Nos in each, 4 storied including electrical, sanitary etc. |
1997 |
| 21 |
Petrobangla Sylhet Gas Fields Co. Ltd (Main Contractor – Press Construction Ltd, Darlington – UK.) |
Fabrication, erection, electrification and instrumentation work of a Molecular Sieve Turbo Expander type Gas Treatment Plant 90 mm cfd at Kailashtilla in Sylhet district. |
1994 |
| 22 |
Chittagong Port Authority (Main Contractor – China Harbour Engineering Co. Ltd of China) |
Fabrication, erection and cladding works of container freight station, workshop and garage at the Backup Facility of the Multipurpose Berth A & B. |
1992 |
| 23 |
Chhatak Cement Co. Ltd
(Bangladesh chemical industries Ltd) & Korea heavy Industries & Construction Co. Ltd.)
|
Erection of Machinery for expansion of Chhatak Cement plant including Cement Mill, Electrostatic Precipitator, kiln and other equipment and accessories. |
1992 |
| 24 |
Jamuna Fertilizer Co. Ltd
(Bangladesh Chemical Industry Corporation).
|
Construction – 2 nos 5 storied Hostel building for the expatriates, one 4- storied Bachelors officers Hostel, one bachelor employees Hostel, one 60m high overhead water Tank and river bank protection work at Tarakandi, Jamalpur district. |
1991 |
| 25 |
Bangladesh Railway (Main Contractor – Daewoo Corporation, Korea) |
For construction of Parbatipur Railway Backshop, fabrication of 1200 Mt of steel structure at the premises of Chittagong Dry Dock and fabrication and erection work of mechanical and electrical equipment and utility services at Parbatipur. |
1990 |
| 26 |
Roads and Highways Dept (Main contractor – Joint venture Interbeton HCG of Holland. |
Construction of 2nd Karnafuli Bridge ( Shah Amanat Bridge) at Chittagong over Karnafuli river measuring 922m long. The work included pier installation (2 m dia steel piers) fabrication and erection of entire steel structure , sand blasting & painting, construction of R.C.C abutment, installation and surface treatment to the wooden deck. |
1988 |
| 27 |
Chittagong Port Authority
(Main Contractor – Interbeton of Holland )
|
Construction of heavy pavement on a area of 20,000 Sq meter on top of a R.C.C suspended deck system and earth jelling works for the projects hard standing area 10,000 square meter. |
1986 |
| 28 |
Chittagong Urea Fertilizer Ltd. |
Construction of including fabrication and erection of 9 nos. Steel Vertical Tank ( Total Weight of the Steel used – 2100 MT) for the Water Treatment Plant under Kurita Water Industries Ltd of Japan. |
1986 |
| 29 |
Bangladesh Power Development Board (Main contractor – Marubeni Corporation, Japan) |
Erection of 2 nos water Turbine with generator, 52 MW each for the Kaptai Hydro power station ( Unit no 4 and 5). |
1986 |
| 30 |
TSP Complex Ltd Bangladesh Chemical Industries Corporation, Chittagong. |
Dismantling & reconstruction of a 500 ton/day Sulpheric Acid plant including fabrication of Absorbing Tower, Drying Tower and 60 m high main stack including all internals, acid resistant bricks pumps, pipings and other accessories. |
1985 |
| 31 |
TSP Complex Ltd Bangladesh Chemical Industries Corporation, Chittagong. |
Construction including civil works, fabrication of structures & vessels and erection including electrification and instrumentation of a granulation plant and Phosphoric Acid Handling system in association with a Dutch company, Hollandse Construction group. |
1983 |
| 32 |
Chittagong Dry Dock Ltd, Bangladesh Steel and Engineering Corporation. |
Construction of a 10,000 Sq meter Workshop Complex Building, water treatment Plant and control building including all piling, foundation, R.C.C Column, office blocks, structural fabrication, cladding, erection of Overhead cranes (9 nos) etc. |
1982 |